agyasmithmartersax agyasmithmartersax
  • 01-05-2017
  • Mathematics
contestada

An average of 2,000 charts need to be coded each month. if it takes an average of 15 minutes to code each chart— how many charts does the average coder code per 8-hour day?

Respuesta :

Bea1111 Bea1111
  • 01-05-2017
Put 8 hours into minutes which is 60•8= 480.
Then divide 480 by 15 to find how many charts are coded in 8 hours by a coder.
480/15= 32.

So the average worker codes 32 charts per 8-hour work day.
Answer Link

Otras preguntas

can you express 9/9 as a mixed number why or why not
Bob bought 24 hockey tickets for $83. Adult tickets cost $5.50 and child tickets cost $2.00. How many of each did he buy . Show your work .
how many pairs of parallel lines does a triangle have
How are mitosis and meiosis different from each other? A. Mitosis produces four different cells and meiosis produces identical cells. B. Mitosis produces four d
Two planes, which are 1810 miles apart, fly toward each other. Their speeds differ by 55 mph. If they pass each other in 2 hours, what is the speed of each?
Compare the temperature of water as ice begins to form with the temperature of ice as it begins to melt
how do you say do you wanna fight me in French?
Suppose that you are building a shed and need to pour concrete slab to support it you know this lab will be 15 feet wide 10 feet long and 6 inches deep concrete
what is 3/8 in simplest form
what is the Nth term of 0 3 8 15 24 35